78-ACRE ASH POND CLOSURE
PROJECT SCOPE
During this project, CBP will excavate, relocate and dewater approximately 3,000,000 cubic yards of ash and construct two ponds lined with geosynthetics. In addition, there will be 1,500,000 cubic yards of structural fill placed, and construction of a 7,000 linear foot slurry wall. To close the project out, CBP will cap the entire 78 acres with closure turf.